Project Overview
Capacity: 120KW
Type: Hybrid solar power system
Location: Don Bosco High School, Mumbai
Challenges Faced
Energy Needs: Ensuring the system meets the school’s high energy demand.
Safety Standards: Adhering to strict safety protocols for an educational institution.
Weather Conditions: Installing during the monsoon season posed significant challenges.
Solutions Implemented
System Customization: Tailored the hybrid system to meet peak demand times.
Safety Protocols: Implemented rigorous safety measures and staff training.
Weather Adaptation: Used weather-resistant materials and flexible scheduling to manage monsoon challenges.
Results
Cost Savings: Significant reduction in electricity bills.
Sustainability Education:
The project serves as a live demonstration of renewable energy for students.